Notices and Cure Deadlines

What does an HOA repaint notice actually mean?

It means your association's inspection process flagged your exterior as out of compliance with the community's recorded standards — usually for faded or chalking color, peeling paint on trim or fascia, mismatched patches, or a color that doesn't match the scheme on file for your lot. The letter will cite the governing-document section involved and give you a cure period to fix it or respond. It's rarely personal and rarely urgent-that-day, but it is a formal step in a process that escalates if ignored, so the right move is to act inside the window it gives you.

How long do I have to comply?

It varies — by community, by how the violation is classified, and by whether this is your first notice or a follow-up. Some letters are courtesy notices with soft timelines; cure letters carry firm dates. Every association's process differs, so the first thing we do is read your specific letter and, where the timeline is tight, contact the association about a written plan of correction — most boards respond well to documented proof that a professional repaint is scheduled, and very badly to silence.

Colors, Schemes and Review Paperwork

Can I pick any color I want?

Almost never. Las Vegas HOA communities maintain limited approved palettes, organized into schemes — coordinated sets of body, trim, and accent colors — and many assign schemes so neighboring homes don't repeat. Repainting in a color that isn't approved for your lot doesn't fix the violation; it creates a new one, and the re-do costs real money. That's why we pull your community's current approved schemes and confirm your options on paper before anyone falls in love with a color.

Who submits the paperwork to the architectural review committee?

We do. Where your community requires an architectural-review application — and many require one even for a like-for-like repaint — we prepare it with the scheme references, color specifications, and surface breakdown committees expect, submit it to your association or management company, and hold the start date until approval comes back. If your community doesn't require review for your project, we confirm that in writing rather than assume it.

What if my current color was never approved in the first place?

It happens more than you'd think — a previous owner repainted off-scheme, or an old approval was never recorded. If we find your house isn't on file with a valid scheme, we'll tell you at the walkthrough, not after the paint is on. The fix is procedural: we work with the association to establish which schemes are available for your lot, submit for approval of one, and repaint to it. It adds a paperwork step, not a crisis.

Scope and Pre-Listing Timing

Can you paint just the front elevation, or just what the letter cites?

Yes — and if that's what the citation requires, that's what we'll quote. Plenty of notices are scoped to specific surfaces: the fascia, the garage door, a faded south wall. We'll close exactly that, and we'll also tell you honestly how the rest of the exterior is aging so you can decide whether finishing the house now makes sense. What we won't do is quietly expand your scope, or paint a partial surface in a way that leaves an obvious mismatch line the inspector will flag next cycle.

How fast can you repaint before a listing goes live?

Tell us the photographer's date and we'll schedule backwards from it. Exterior-only projects have a real speed advantage — no furniture, no household disruption — and where the calendar is tight we sequence the street-facing surfaces first so the front elevation is photo-ready even if side and rear elevations finish shortly after. The honest constraints are weather windows and any HOA approval step, which is why calling before the photographer is booked beats calling after.

Is repainting just the trim, front door, and garage door worth doing?

Often, yes — those accent surfaces are a large share of what a buyer or an inspector actually sees, and they're usually the first surfaces to fade or peel. A crisp fascia line, a front door with real depth of color, and a refreshed garage door can modernize a facade whose body paint is still sound. We'll assess at the walkthrough: if accents alone get you there, that's the scope we'll recommend; if the body fade will undercut the effect, we'll say that instead.

Finish Standards and Closure Proof

What does my HOA actually receive when the job is done?

A closure package: photographs of every surface the notice cited, taken after completion; confirmation of the scheme and colors used so the association can match them against what's approved for your lot; and a completion summary the manager can drop into the file. Most violations close on that documentation alone. If your community re-inspects instead, the package still matters — it's your record that the cure happened inside the window.

How many coats do you apply?

Every color change gets two full coats of Sherwin-Williams paint over genuine prep — washing, scraping and sanding failed areas, patching stucco, and priming repairs. One coat over a faded desert exterior leaves the old, sun-worn tone ghosting through and reads uneven in exactly the harsh midday light HOA inspectors and listing photographers both work in. Two coats is what real coverage takes, and it's quoted that way from the start.

Have a question that isn't covered here? Call (725) 353-2243 or send us your project details and we'll give you a straight answer.

Ask Us About the Letter You're Holding

Call — five minutes on the phone beats an evening of reading your CC&Rs alone.

TALK TO ALEX